
This site is no longer actively updated; if you have a current subscription to Earthscan journals please go to https://www.ingentaconnect.com/register/institutional to register on the new site and gain access to your journal; if you are not a current subscriber go to sales@portland-services.com to subscribe, or to www.earthscan.co.uk/journals for more information.
Architectural Engineering and Design Management
Architectural Engineering and Design Management 1 (2006) 247259
|

|
|
Article
|

|
|
Contract Documentation and the Incidence of Rework in Projects
|

|
|
Peter E D Love, David J Edwards and Jim Smith
|

|
|

|
Abstract
Within the Australian construction industry, rework has been identified as a significant factor that contributes to cost increases and project completion delays. It has been suggested that a major cause of rework relates to the quality of contract documentation that is produced by design consultants and that higher fees paid to consultants would result in improved contract documentation quality. Using a questionnaire survey, this paper determines the key contract documentation variables that influenced rework costs in 161 construction projects. Evidence from the findings presented form the basis of practical suggestions made for improving the management of the design process and the production of contract documentation in projects. However, no significant relationship between contract documentation and rework could be established from the findings presented.
Keywords: Construction project management; contract documentation; quality; rework
download full article
|